
geothermal power electricity grid
- NETSKYvirus
- FWG Squire
- Posts: 241
- Joined: 10 Sep 2009, 01:04
- Location: sodium coolant Fast reactor + geothermal loop 1000mwe, vertical aquaponic towers city
- Contact:
- NETSKYvirus
- FWG Squire
- Posts: 241
- Joined: 10 Sep 2009, 01:04
- Location: sodium coolant Fast reactor + geothermal loop 1000mwe, vertical aquaponic towers city
- Contact:
Re: geothermal power electricity grid
TGEM:
Tungsten Gyrotron Electrotelleric Method:
- drills 9 times (4 million USD for 10km depth).
- drills 9 times (4 million USD for 10km depth)
Tally 8 million USD.
- The supracritical turbine (100 million USD)
- Bermswales or Swales (50million USD)
- Lake
- Pond
- Solar panel farm injection
- Movement of water into injection well
(ok)
- The reuptake supracritical steam:
- 660mwe SC turbine
- 660mwe SC turbine
- The City is powered by 1,32 Gigawatts clean electricity.
*city is net zero" LEED gold zone.
Tungsten Gyrotron Electrotelleric Method:
- drills 9 times (4 million USD for 10km depth).
- drills 9 times (4 million USD for 10km depth)
Tally 8 million USD.
- The supracritical turbine (100 million USD)
- Bermswales or Swales (50million USD)
- Lake
- Pond
- Solar panel farm injection
- Movement of water into injection well
(ok)
- The reuptake supracritical steam:
- 660mwe SC turbine
- 660mwe SC turbine
- The City is powered by 1,32 Gigawatts clean electricity.
*city is net zero" LEED gold zone.
- NETSKYvirus
- FWG Squire
- Posts: 241
- Joined: 10 Sep 2009, 01:04
- Location: sodium coolant Fast reactor + geothermal loop 1000mwe, vertical aquaponic towers city
- Contact:
- NETSKYvirus
- FWG Squire
- Posts: 241
- Joined: 10 Sep 2009, 01:04
- Location: sodium coolant Fast reactor + geothermal loop 1000mwe, vertical aquaponic towers city
- Contact:
Re: geothermal power electricity grid
The loop of TGEM, Geothermal Singularity <-> and Singlet fission solar panels (SFSPs), to make net zero Al Gore 2000.
Singlet Fission Solar panels:
1. Siemen process
2. Free float zone method
3. Singlet fission quantum lithography
4. Packaging
= 130% efficiency Solar panels
- The "heat pumps" to power offices, aparment, House pergolas.
Singlet Fission Solar panels:
1. Siemen process
2. Free float zone method
3. Singlet fission quantum lithography
4. Packaging
= 130% efficiency Solar panels
- The "heat pumps" to power offices, aparment, House pergolas.
- NETSKYvirus
- FWG Squire
- Posts: 241
- Joined: 10 Sep 2009, 01:04
- Location: sodium coolant Fast reactor + geothermal loop 1000mwe, vertical aquaponic towers city
- Contact:
- NETSKYvirus
- FWG Squire
- Posts: 241
- Joined: 10 Sep 2009, 01:04
- Location: sodium coolant Fast reactor + geothermal loop 1000mwe, vertical aquaponic towers city
- Contact:
- NETSKYvirus
- FWG Squire
- Posts: 241
- Joined: 10 Sep 2009, 01:04
- Location: sodium coolant Fast reactor + geothermal loop 1000mwe, vertical aquaponic towers city
- Contact:
Re: geothermal power electricity grid
- Winning at Colgate, Crest (toothpaste that contains: fluorides).
- Key of Aluminium Electroflux and production of Fluorides in excess.
* Key words * Lithium Fluoride, Beryllium Fluoride (FLIBE ) liquids that are Safe and Compliant
- This temperature medium allowance of >Criticality in Hexs, and, does not expand like Liquid light water reactors.
- This means:
- This FLIBE is more stable than Liquid water.
::: Thus :::
LEU, Low enriched uraniums 238 or U238
- Goes into the High Assay Low Enriched Uranium
- In TRISO Walnuts (size of 2" diameters)
- In freezeplug controlling mechanism, and, assist in containment of FLIBE (criticality circulates)
- FLIBE's hex powers enables that the water circulation turns into H.P. Steam
- H.P. Criticality steam turns 40megawatt turbines.
- Condensors and Loop heat goes from miles in pipelay works to allowance Heat to dissipate inside "polytunnels greenhouses."
- Pools water in the Hesco pondpurse for inject and condensation.
:::
FLIBE a carrying heat exchange medium is stable. And, allowance of HALEU TRISO, SMRs, to operate
- in case of emergency, the freezeplug melts and gravity drains the FLIBE into the Pool (solid)
- this makes, FLIBE TRISO SMRs rank safety compliance SMRs in the USA.
#
40megawatts (EROEI Input)
#
Tungsten drills 3km, and Gyrotron (wendelstein's core ) plasma drills into the bedrock for addition of 7km to 13km and patterns enabled.
- The Injection of Hesco bermpools allowance circulation cells in the daughter magmafields to yield
- Steam hypercriticality (is desired side effect, outcomes) to evaporate and High pressure steam to escape from the borewells.
- The HPS force pushes the Steam turbines at High momentums and stator turns at RPM 1200 to 1668
- This enables Triwounds of 60hertz and 110v to be on grid Step up and
- Delivery by truss pylons.
# 170megawatts (estimate EROEI output).
OF:
If the Daughter borewell is exceed and outperformance of 40mwe input, and higher
= excellence at be, 50mwe range to 660mwe range
- On Grid reliabilities - to service 365d for indefinite lifespan of stators' tolerance and equipments' tolerances.
**
- NETSKYvirus
- FWG Squire
- Posts: 241
- Joined: 10 Sep 2009, 01:04
- Location: sodium coolant Fast reactor + geothermal loop 1000mwe, vertical aquaponic towers city
- Contact:
Who is online
Users browsing this forum: No registered users and 3 guests



